HUDSON RIVER PROJECT UPDATE

The Notice of Intent (NOI) to Prepare Draft Environmental Impact Statement for the Rebuild by Design Hudson River Project was published in the Federal Register this morning. As a part of the NOI, a Draft Scoping Document must be made available to the public for review. Comments will be accepted through October 9, 2015.

All comments should be sent via email to rbd-hudsonriver@dep.nj.gov; or by mail to David Rosenblatt, Director, Office of Flood Hazard Risk Reduction Measures, 501 East State Street, Mail Code 501-01A, PO Box 420, Trenton, NJ 08625-0420. Read the Draft Scoping Document.

Visit NJ DEP’s project page for more information.

Translate